• Welcome aboard HomebuiltAirplanes.com, your destination for connecting with a thriving community of more than 10,000 active members, all passionate about home-built aviation. Dive into our comprehensive repository of knowledge, exchange technical insights, arrange get-togethers, and trade aircrafts/parts with like-minded enthusiasts. Unearth a wide-ranging collection of general and kit plane aviation subjects, enriched with engaging imagery, in-depth technical manuals, and rare archives.

    For a nominal fee of $99.99/year or $12.99/month, you can immerse yourself in this dynamic community and unparalleled treasure-trove of aviation knowledge.

    Embark on your journey now!

    Click Here to Become a Premium Member and Experience Homebuilt Airplanes to the Fullest!

Sonerai I elevator pushrod

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

Sonerai Ken

New Member
Joined
Feb 7, 2022
Messages
3
Can anyone explain the elevator push-rod design? The plans call out an AN 490 threaded insert----problem is that for a 5/8" diameter tube the insert has 5/16-24 threads and the clevis ends (attaching to the elevator horn) have 1/4-28 internal threads. Also, the plans change section says to flatten the end of the tube (presumably the end attaching to the mixer), weld on plate and washers. OK, the tube must be able to rotate to accommodate the movement of the control mixer how does this design allow that? Seems to me that you must incorporate a rod bearing somewhere to account for the rotation. I appreciate any feedback.
 
Ken,

Dave Wilcox wrote a piece on his elevator pushrod solution. You should be able to find it in the "Articles" section. It should answer most of your questions.
 
Can anyone explain the elevator push-rod design? The plans call out an AN 490 threaded insert----problem is that for a 5/8" diameter tube the insert has 5/16-24 threads and the clevis ends (attaching to the elevator horn) have 1/4-28 internal threads. Also, the plans change section says to flatten the end of the tube (presumably the end attaching to the mixer), weld on plate and washers. OK, the tube must be able to rotate to accommodate the movement of the control mixer how does this design allow that? Seems to me that you must incorporate a rod bearing somewhere to account for the rotation. I appreciate any f
 
Back
Top